Details
-
Feature
-
Status: Dismissed (View Workflow)
-
Minor
-
Resolution: Won't Fix
-
None
-
None
Description
Current Situation
- In a nested job chain the node for the inner job chain cannot be skipped.
Desired Behavior
- The behavior for nested job chains should be same as for a single job chains.
- Skipping the node that points to the inner job chain would skip processing of that job chain.
Maintainer Notes
- This feature depends on
JS-1394which is a known issue.
Attachments
Issue Links
- requires
-
JS-1394 "skip node" option in a nested job chain should work
- Known Issue