Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-47

In a nested job chain the "skip node" option should be available

    XMLWordPrintable

Details

    • Feature
    • Status: Dismissed (View Workflow)
    • Minor
    • Resolution: Won't Fix
    • None
    • 1.10
    • None

    Description

      Current Situation

      • In a nested job chain the node for the inner job chain cannot be skipped.

      Desired Behavior

      • The behavior for nested job chains should be same as for a single job chains.
      • Skipping the node that points to the inner job chain would skip processing of that job chain.

      Maintainer Notes

      • This feature depends on JS-1394 which is a known issue.

      Attachments

        Issue Links

          Activity

            People

              oh Oliver Haufe
              mp Mahendra Patidar
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - 1 day
                  1d
                  Remaining:
                  Remaining Estimate - 1 day
                  1d
                  Logged:
                  Time Spent - Not Specified
                  Not Specified