Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-1741

Releasing schedules should re-create orders accurately

    XMLWordPrintable

Details

    Description

      Current Situation

      A schedule S1 is assigned the workflow W1
      S1 is assigned a run-time

      • Repeat every 3 Minutes 18:00-20:00

      S1 is configured with

      • Plan Orders automatically: Yes
      • Submit Orders to Controller when planned: Yes

      When releasing S1 the daily plan is updated with one submitted order that holds the cycling orders

      When releasing S1 again without any changes then all submitted orders are removed from the daily plan.

      Note: This does not happen with single start run-times. This also does not happen when the repeat interval is longer (e.g. 30 minutes).

      Desired Behavior

      Releasing a schedule should always create the daily plan according to the run-time configuration.

      Patches

      Attachments

        Issue Links

          Activity

            People

              sp Santiago Aucejo Petzoldt
              ur Uwe Risse
              Gautam Vadera Gautam Vadera
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: