Details
-
Fix
-
Status: Released (View Workflow)
-
Minor
-
Resolution: Fixed
-
1.12.4
-
None
Description
Current Situation
- A nested job chain includes two job chains chain1 and chain2.
- An order is assigned to the nested job chain that passes chain1 and chain2.
- In the JOC Cockpit, with the Job Chains tab, under Order History, the duration for the execution of chain2 is always <1 sec
- see screenshots order-history-nested-chain.png
Desired Behavior
- The duration for all the job chains in a nested job chain should be correct.
Attachments
Issue Links
- requires functional consideration of
-
JS-1797 In nested job chains wrong values for the "end_time" column are created for the last job chain node
- Released