Details
-
Feature
-
Status: Dismissed (View Workflow)
-
Medium
-
Resolution: Works as designed
-
None
-
None
-
None
Description
Current Behavior
- The Cycle Instruction allows defining a period for which the cycle is repeated. Job Admission Times allow defining a period for which a job can run before being terminated.
- For both instructions the period
- can be specified to exceed 24 hours if one of the following Admission Time Schemes is used: MonthlyWeekdayPeriod, SpecificDatePeriod, MonthlyDatePeriod
- cannot be specified to exceed 24 hours if the following Admission Time Scheme is used: DailyPeriod
- As a result, if a Cycle Instruction is configured using weekdays, then the period cannot exceed 24 hours.
- The cycle of a Cycle Instruction with a period that extends past midnight stops at midnight for all Admission Time Scheme.
Desired Behavior
- The cycle of a Cycle Instruction with a period that extends past midnight should not stop at midnight.
- The Cycle Instruction and Job Admission Times should allow exceeding the 24 hours' period for use with the DailyPeriod Admission Time Scheme similar to all other schemes.
Maintainer Notes
- The issue is dismissed as building blocks for the feature are already available from the Controller. Remaining functionality is added to JOC Cockpit from
JOC-2243.
Attachments
Issue Links
- is related to
-
JOC-2243 Cycle Instruction should work with a period that extends past midnight
-
- Released
-