Uploaded image for project: 'JS - JobScheduler'
  1. JS - JobScheduler
  2. JS-1176

If you change a job configuration while the database connection get lost then the JobScheduler can crash

    XMLWordPrintable

Details

    Description

      The following steps force a JobScheduler crash:

      • a job is choosen in JOC and displayed in the right frame
      • stop the database while JobScheduler is running
      • change a job configuration (e.g. the run_time)
      • wait a little time until the JobScheduler knows that the configuration has changed
      • click "update" in JOC which sends particularly:
        <check_folders/>
        
      • start the database

      Then after a while (when the automatic db-reconnect occurs) the JobScheduler is down.
      See attached log.

      Attachments

        1. hs_err_pid3219.log
          51 kB
        2. scheduler_win.log
          219 kB
        3. scheduler.log
          987 kB

        Issue Links

          Activity

            People

              jz Joacim Zschimmer
              oh Oliver Haufe
              Florian Schreiber Florian Schreiber (Inactive)
              Oliver Haufe Oliver Haufe
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 5 hours
                  5h