Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-969

Operation to skip a job job should be available for job stream jobs assigned to a starter

    XMLWordPrintable

Details

    Description

      Current Situation

      When a job makes use of an In Condition and the job is assigned a calendar, then the job will be skipped if the calendar does not match the current day. When skipping this job then the events from the Out Condition will be created.
      The feature to skip a job is only available for jobs that use an In Condition and that will be started if the In Condition is true. It is not available for jobs that are assigned a starter.

      Desired Behavior

      Skipping jobs that use a calendar that does not match the current day should be available for jobs that are assigned a starter.

      Attachments

        Activity

          People

            ur Uwe Risse
            ur Uwe Risse
            Chanchal Khatri Chanchal Khatri (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: