Details
-
Feature
-
Status: Released (View Workflow)
-
Minor
-
Resolution: Fixed
-
1.13.4
-
None
Description
Current Situation
When assigning a calendar to a run-time without specifying a period, then future execution dates are not displayed with the run-time preview.
When assigning a timeslot for the period 00:00-24:00 then the run-time preview displays future execution dates.
Desired Behavior
When no period is assigned to a run-time using a calendar, then the default period timeslot=00:00-24:00 should be used and future execution dates should be displayed with the run-time preview.