Schedule is not substituted from the Resource Tab

    XMLWordPrintable

Details

    • Fix
    • Status: Released (View Workflow)
    • Minor
    • Resolution: Fixed
    • 1.13.3
    • 1.13.4
    • None

    Description

      Current Situation:
      On creating the schedule and add a substitute to that schedule, the parameter schedule substitute is not visible in the schedule.xml

      How to Reproduce:

      • Crete Two schedule in job Configuration folder(schedule1 and schedule2)
      • In the Resources tab switch to the schedule.
      • Select a folder where the schedule is created.
      • From the action, menu schedule1 click on the Add substitute button. A pop-up window will be open to adding a substitute
      • Add schedule2 as a substitute of schedule1.
      • In the schedule.xml the parameter schedule substitute is not visible(substitute are not added in the schedule).

      Desired Behaviour:
      From the resources tab, the added substitute should be visible in the schedule.

      Patch
      To solve this issue a patch for 1.13.3 is available here.

      • Download the patch
      • Copy the file to sos-berlin.com\joc\jetty_base\patches
      • CD to sos-berlin.com\joc\jetty_base\patches
      • Execute java -jar bin\patch-executor-1.13.3.jar

      Attachments

        Activity

          People

            oh Oliver Haufe
            chanchal-khatri Chanchal Khatri (Inactive)
            Kanika Agrawal Kanika Agrawal
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: