Details
-
Fix
-
Status: Released (View Workflow)
-
Minor
-
Resolution: Fixed
-
1.13.3
-
None
Description
Current Situation:
On creating the schedule and add a substitute to that schedule, the parameter schedule substitute is not visible in the schedule.xml
How to Reproduce:
- Crete Two schedule in job Configuration folder(schedule1 and schedule2)
- In the Resources tab switch to the schedule.
- Select a folder where the schedule is created.
- From the action, menu schedule1 click on the Add substitute button. A pop-up window will be open to adding a substitute
- Add schedule2 as a substitute of schedule1.
- In the schedule.xml the parameter schedule substitute is not visible(substitute are not added in the schedule).
Desired Behaviour:
From the resources tab, the added substitute should be visible in the schedule.
Patch
To solve this issue a patch for 1.13.3 is available here.
- Download the patch
- Copy the file to sos-berlin.com\joc\jetty_base\patches
- CD to sos-berlin.com\joc\jetty_base\patches
- Execute java -jar bin\patch-executor-1.13.3.jar