Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-24

When skipping or stopping a job chain node it should be possible to enter a comment

    XMLWordPrintable

Details

    Description

      Feature
      When skipping or stopping a job chain node it should be possible to enter a comment (e.g. reason for skipping/stopping).
      This comment should be displayed together with the job chain node as long as the job chain node is skipped/stopped.

      Maintainer Notes
      This feature is available from the JOC Cockpit - Audit Log and is therefore not implemented with the JobScheduler Master.

      Attachments

        Issue Links

          Activity

            People

              oh Oliver Haufe
              oh Oliver Haufe
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - 1 day
                  1d
                  Remaining:
                  Remaining Estimate - 1 day
                  1d
                  Logged:
                  Time Spent - Not Specified
                  Not Specified