XMLWordPrintable

Details

    Description

      Current Situation

      • The run-time of a schedule is assigned a calendar, a period and optionally a restriction.
      • It is not possible to switch calendar without loosing data. If a different calendar should be used, then the run-time entry must be deleted and must be re-entered.

      Desired Behavior

      • It should be possible to switch calendar in the run-time of a schedule without having to re-enter the period or the restriction.

      Attachments

        Activity

          People

            ztsa0019 Sourabh Agrawal
            ur Uwe Risse
            Pramokshi Narawariya Pramokshi Narawariya
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: