Details
-
Feature
-
Status: Released (View Workflow)
-
Minor
-
Resolution: Fixed
-
2.5.7, 2.6.4
-
None
Description
Current Situation
- The run-time of a schedule is assigned a calendar, a period and optionally a restriction.
- It is not possible to switch calendar without loosing data. If a different calendar should be used, then the run-time entry must be deleted and must be re-entered.
Desired Behavior
- It should be possible to switch calendar in the run-time of a schedule without having to re-enter the period or the restriction.