Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-156

Substituted Schedules are not considered In Order Start Times

    XMLWordPrintable

Details

    • Fix
    • Status: Dismissed (View Workflow)
    • Minor
    • Resolution: Works as designed
    • 1.11.1
    • 1.11.2
    • JOC Cockpit GUI
    • None
    • Windows / Web Browser

    Description

      Current Situation

      • Substituted Schedules (configured in JOE) are incorrectly shown in the Cockpit.
        • (The substitution is shown in JOE with incorrect Valid To and Valid From times but is correctly saved to the file system.)
        • In the JOC Cockpit Resources/Schedules view:
          • the substitution is shown correctly in the Valid From Valid To and Substituted by columns.
          • the substitution is not shown correctly in the Used by Orders and Used by Jobs columns (values are 0).
        • The substitution is not considered in the Next Start Time column in the Orders View or in the Jobs View (for a stand-alone Job). The original (i.e. unsubstituted) start time is shown.
        • In the Resources View it is not clear that the Valid From and Valid To columns refer to Substitutions and not to the schedule itself.

      Desired Behaviour

      • Schedule substitution should be considered:
        • when calculating the Next Start Time for an Order or a stand alone Job.
        • when determining the values in the Used by Orders and Used by Jobs columns of the Resources/Schedules view.
      • The layout of the Resources View table should make the relationship between the Valid From and Valid To columns and Substitutions clear.

      Attachments

        Activity

          People

            sp Santiago Aucejo Petzoldt
            aa Alan Amos
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: