The JobStreams view does not create the graph if the event name contains more than one "."

    XMLWordPrintable

Details

    • Fix
    • Status: Released (View Workflow)
    • Minor
    • Resolution: Fixed
    • 1.13.9
    • 1.13.10
    • None
    • None

    Description

      Current Situation

      When a JobStreams contains a job with more than 1 "." then the graph does not connect the jobs which have In Condition with the event name.

      If the job has only 1 "." for e.g. job name is job.1 then the event made by this job will be job_1 but if the job name is job.a.1 then it creates the event as job_a.1 i.e. it converts only first "." to "" and 2nd "." is not changed due to which job is connected in the graph.

      Desired Behavior

      The JobStreams view should create the graph if the event name contains more than one "."

      Attachments

        Activity

          People

            ztsa0019 Sourabh Agrawal
            divyani-rathore Divyani Rathore
            Divyani Rathore Divyani Rathore
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: