Details
-
Fix
-
Status: Released (View Workflow)
-
Minor
-
Resolution: Fixed
-
1.13
-
None
Description
Current Situation
- The Job Chain configuration when including more than one file order source with a next state then graphical view always shows the connection to the first node of the job chain.
How to Reproduce
- Unzip the configuration JOC-1035.zip
in the live directory.
- Switch to the Job Chains -> Steps/Nodes in the Configuration tab. Both the file order sources show the connection according to the next state. Refer to the screenshot JOC-1035-Configurationtab.png
- Switch to the Job Chains detailed view in the Job Chains tab. Both the file order sources show the connection to the first node only. Refer to the screenshot JOC-1035-JobChainsView.png
Desired Behavior
- The Job Chains graphical view should show the connection according to the next state added in the file order source.