Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-1035

Job Chains view should consider the Next_State for the file order source

    XMLWordPrintable

Details

    Description

      Current Situation

      • The Job Chain configuration when including more than one file order source with a next state then graphical view always shows the connection to the first node of the job chain.

      How to Reproduce

      • Unzip the configuration JOC-1035.zip in the live directory.
      • Switch to the Job Chains -> Steps/Nodes in the Configuration tab. Both the file order sources show the connection according to the next state. Refer to the screenshot JOC-1035-Configurationtab.png
      • Switch to the Job Chains detailed view in the Job Chains tab. Both the file order sources show the connection to the first node only. Refer to the screenshot JOC-1035-JobChainsView.png

      Desired Behavior

      • The Job Chains graphical view should show the connection according to the next state added in the file order source.

      Attachments

        1. JOC-1035.zip
          1 kB
        2. JOC-1035-Configurationtab.png
          JOC-1035-Configurationtab.png
          74 kB
        3. JOC-1035-JobChainsView.png
          JOC-1035-JobChainsView.png
          41 kB

        Activity

          People

            ztsa0019 Sourabh Agrawal
            Kanika-Agrawal Kanika Agrawal
            Kanika Agrawal Kanika Agrawal
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: