Details
-
Fix
-
Status: Released (View Workflow)
-
Major
-
Resolution: Fixed
-
1.13.1
-
None
-
None
Description
Current Situation
- If a calendar is assigned a job's run-time with the period "timeslot" and is stored with the database then when using the "Edit run-time" operation once again for this job the calendar assignment is lost.
How to Reproduce
- Create a Calendar using JOC Cockpit.
- Create a job, assign the Calendar the job's run-time and define a timeslot period.
- Deploy the job.
- Open the run-time editor in the configuration view again
- update the timeslot from the run-time period of the job.
- Deploy the job.
- Switch to the jobs view and navigate to the job
- Review the run-time to observe that the calendar assignment has been removed.
Desired Behavior
- The Calendar assignment should not be removed from the run-time when updating a timeslot period.