Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-481

Operation "Terminate with Timeout" should work from Job Chains List view and Details view

    XMLWordPrintable

    Details

    • Type: Fix
    • Status: Released (View Workflow)
    • Priority: Minor
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 1.12.5
    • Component/s: None
    • Labels:

      Description

      Current Situation

      • Using the Job Chains view with a task running allows the operation "Terminate with Timeout".
        • Using the Details view
          • the operation for task control is not available, see JOC-482
          • and clicking the job chain name that brings the user to the single chain view then this operation does not work - it is simply ignored.
        • Using the List view this operation brings up a screen that asks for the timeout (which is good). However, the task then gets immediately killed, i.e. the timeout is ignored.

      Desired Behavior

      • The timeout for the "Terminate with Timeout" operation should be considered.
      • The "Terminate with Timeout" operations should work from both List view and single chain view that is activated from the Details view.

        Attachments

          Activity

            People

            • Assignee:
              ztsa0019 Sourabh Agrawal
              Reporter:
              ap Andreas PĆ¼schel
              Approver:
              Mahendra Patidar
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: