Uploaded image for project: 'JOC - JobScheduler Operations Center'
  1. JOC - JobScheduler Operations Center
  2. JOC-1089

The cyclic start indicator with the Daily Plan should display correct values for a "repeat start-start" interval

    XMLWordPrintable

Details

    • Fix
    • Status: Released (View Workflow)
    • Minor
    • Resolution: Fixed
    • 1.13
    • 1.13.9
    • None
    • None

    Description

      Current Situation
      When a "repeat start-start" interval is assigned the run-time of a job stream Starter then the GUI displays a "repeat end-start" start type with the Daily Plan view.

      How to Reproduce

      • Login to the JOC Cockpit
      • Switch to the Job Streams tab
      • Use an existing job stream
      • Assign a run-time with "repeat start-start" interval
      • Switch to the Daily Plan view and review the start type of the job stream

      Desired Behavior
      The start type in the Daily Plan view should be displayed correctly for a "repeat start-start" interval.

      Attachments

        Activity

          People

            ur Uwe Risse
            Aditi-Dubey Aditi Dubey (Inactive)
            Aditi Dubey Aditi Dubey (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: