A JITL Job should check expected and real duration

    XMLWordPrintable

Details

    • Feature
    • Status: Dismissed (View Workflow)
    • Minor
    • Resolution: Bogus
    • None
    • 1.11.5
    • None

    Description

      Current Situaion

      The daily plan shows the expected and the real duration. When the real duration is longer (or shorter) than the expected duration nothing happens

      Desired Behaviour

      There should be a jitl job that checks the expected and real duration for a significant difference. If so an email should be send.

      Maintainer Notes

      • This issue does not describe a valid change request. The functionality to forecast the duration of the job execution will not be updated by a job.
      • This topic will be discussed with the introduction of jobnets for JobScheduler 2.0 based on an updated architecture that should allow to forecast without the use of additional jobs.

      Attachments

        Activity

          People

            ur Uwe Risse
            ur Uwe Risse
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved:

              Time Tracking

                Estimated:
                Original Estimate - 1 day
                1d
                Remaining:
                Remaining Estimate - 1 day
                1d
                Logged:
                Time Spent - Not Specified
                Not Specified