Uploaded image for project: 'JITL - JobScheduler Integrated Template Library'
  1. JITL - JobScheduler Integrated Template Library
  2. JITL-120

JITL: It should be possible for the sync job that stopped job chains are ignored

    XMLWordPrintable

Details

    • Feature
    • Status: Released (View Workflow)
    • Minor
    • Resolution: Fixed
    • None
    • 1.7.4
    • None

    Description

      When a sync job is used in a stopped job chain this job is taken into consideration for the syncing. Therefore the sync in other job chains will not be released as long one job chain with the sync node is stopped.

      There should be an option scheduler.ignore_sync_jobs_in_stopped_jobchains to let the stopped job chains be ignored. The option should be available as a scheduler variable and a a task/order parameter

      Activity

      Attachments

        Activity

          People

            ur Uwe Risse
            ur Uwe Risse
            Uwe Risse Uwe Risse
            Oliver Haufe Oliver Haufe
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: